Land plots in Saint-Petersburg and Leningrad Region

Sale of land in Shushary Industrial Area

Object Land plot with the total area of 20 ha.
Location Saint-Petersburg, Pushkinskiy District, Shushary settlement, "Shushary" industrial area.
The plot lies approximately 500 m away from Moskovskoe Highway, and approximately 850 m away from GM and Toyota production facilities.
The distance from the KAD junction along Moskovskoe Highway is about 2 km.
Description The land plot lies in the immediate vicinity of the KAD, 1,5 km away from "Lenta" hypermarket, and can bee seen from Moskovskoe Highway. It has smooth relief without any planting.
In the vicinity of the plot there are: "Lenta" hypermarket, "PTK" gas station, warehouse terminals, lumber depot, new warehouse complex for stockpiling bulk foodstuff products (tea, coffee).

The following formalities on the object has been completed:
The instruction of Committee on City Planning and Architecture (KGA) for the preparation of territory planning project and site drawing has been issued.
The initial data have been received from KGA, Committee on State Control, Use and Protection of Historical and Cultural Landmarks (KGIOP), Committee for Nature Management, Environment Protection and Ensuring of Environmental Safety (KPOOS), Main Directorate for Civil Defense and Emergencies, Committee on Land Resources and Land Development, City Property Management Committee (KUGI), Committee on Energetics and Engineering (KEIO).
Layout and siting of the plot have been completed.
Topographic mapping has been done of both the plot (M1:500) and the whole area (M1:2000).
Transport accessibility Near the plot there are the roads of 1st and 2nd categories.

Public transport
It is planned to build new metro station "Balkanskaya" in 2015 – 2025. It is also planned to build high-speed tram railway along Sofyiskaya Street.
Land status Owned by a legal entity.
Settlement land.

As per the General Plan the plot lies within PD zone (zone of industrial, logistical, transport, warehousing, engineering infrastructure facilities, including public and business objects for servicing the given zone).

As per Zoning and Development Plan, the plot is assigned to TP5 subzone (subzone of industrial facilities involved in the production of machinery and relevant equipment, transportation vehicles and relevant equipment, including the objects of metallurgical production and production of metalware, textile production, pulp and paper production, production of electronic and optical equipment, enterprises of information and telecommunication sector, as well as engineering infrastructure facilities).
Communications Electricity
Main source – Electric Power Substation № 705.
In the year 2010 it is planned to build "Shushary" Electric Power Substation" for 110 kV.
(Agreement of Engagement and Interaction between Saint-Petersburg and RAO UES of Russia reg. №25-C of 01.08.2006).

Heating
No sources of central heating.

Gas supply
Main source – "Southern TETs" Gas Distribution Plant. Output reserve is available.

Water supply
Main source – Southern Waterworks (UVS).
Construction of water pipelines from Korchmino settlement to Pushkin is to be carried out in the year 2007.
Construction of new water treatment unit at Water Treatment Station in Kolpino is to be completed in the year 2013.
(General Water Discharge Scheme of Saint-Petersburg for the period up to 2015, regarding the outlook of up to 2025, approved by Resolution of the Government of Saint-Petersburg №158725 of 11.12.2007).

Sewage system
Main source – Sewage treatment facilities in the town of Pushkin.
Modernization of sewage treatment facilities in Metallostroy settlement in the year 2013.
Construction of sewage reservoir Shushary – Metallostroy in the year 2013.
Possible use Industrial and business development.
Price $ 35 per sq.m.